Every board is inspected against published specifications before shipment: 100% inflation hold test at 18.0 PSI for 24 hours (auto-reject above 0.50 PSI pressure drop), tensile and seam-peel testing per ISO 1421, and a 100-point assembly checklist. The lab reports to the managing director, not production, and can halt any shipment.

Specifications verified: 2026-08

Every board that leaves our workshop carries the certification that it has passed a defined set of quality inspections and material tests. Our Quality & Inspection Lab is an independent function within the organisation — it reports directly to the managing director, not to production — ensuring that no commercial pressure can compromise the inspection gate. If a material batch or a completed board does not meet the published specification, the lab has the authority to halt shipment until the non-conformance is resolved.

Trust, but verify

The lab operates under a quality management system aligned with ISO 9001 principles, and our test methods are based on ISO, ASTM, and EN standards wherever applicable. We maintain detailed records of every test performed, creating a complete traceability chain from raw material receipt to final board delivery.

Test equipment and capabilities

EquipmentTests PerformedStandard / Method
Universal testing machine (50 kN)Tensile strength (fabric), peel resistance (seams), tear propagationISO 1421, ISO 4674
Air-retention test rig (programmable)1000-cycle inflation/deflation endurance, 30 min pressure-hold testInternal (per ISO 6185 method)
Seam-peel jig (motorised 180° peel)Weld and glued-seam peel strength at 100 mm/minISO 1421 / ASTM D1876
Hydrostatic head testerWater penetration resistance of fabric (0–1000 mbar)ISO 811
Digital thickness gauge & micrometreFabric thickness, weld thickness, adhesive-film thicknessISO 2286-3
Environmental chamberTemperature conditioning (-40 °C to +80 °C) for cold-crack and heat-ageing testsISO 188, ISO 4675
Colour spectrophotometerDelta-E colour measurement after UV exposureISO 105-A05 / ASTM D2244

The inspection gates — from material to delivery

Every board follows a defined quality plan with mandatory inspection points. No board can skip a gate; each gate must be signed off by a quality inspector before the next production stage begins.

Gate 1

Incoming material inspection

Fabric batch, drop-stitch core, adhesive batch, hardware — all checked against incoming specification before release to production.

Gate 2

In-process weld inspection

First-off weld coupon tested (peel + visual) at start of each production shift.

Gate 3

Chamber air test

Board pressurised to 18.0 PSI (12–15 PSI working), held 24 h. Pressure drop > 0.50 PSI auto-rejects. Data logged per serial number.

Gate 4

Pre-delivery inspection

Complete board inspected: all fittings torqued, deck pad adhesion, graphics alignment, no cosmetic defects. 100-point checklist.

Gate 5

Final certification

Test reports compiled, inspection records reviewed, Certificate of Conformance issued.

Standard checks on every batch

18 PSI 18.0 PSI in chamber air test, held 24 h
> 5 % Pressure drop triggers automatic rejection
100 % Chambers air-tested before assembly
ISO 9001 Quality management system

Our quality team

The lab is staffed by a quality manager (10 years in marine QA, ASQ Certified Quality Engineer), two quality inspectors (each with Level 2 NDT certification in visual testing), and a materials technician responsible for all physical testing. The team undergoes annual proficiency testing through an independent third-party provider to ensure that our test results remain accurate and reproducible.

Independent testing for clients

Our Quality & Inspection Lab is available for independent testing services. If you need to verify a fabric specification, validate a new adhesive system, or obtain a third-party test report for a procurement qualification, we can perform the tests to the applicable standard and issue a certified test report.

Examples of recent third-party testing work:

  • Peel-strength comparison of five competitive adhesive film products for a European procurement programme.
  • Accelerated ageing study (UV + thermal cycling) for a new orange-pigmented PVC formulation, with regular interim measurements at 500 h intervals.
  • Air-retention validation of 50 prototype valve assemblies for a new high-pressure board design.

Our commitment to you

When you receive a {SITE.name} board, you also receive its quality dossier — a compiled record of the test results that apply to your specific board. Fabric batch certificate, weld peel tests, chamber air-test logs, and pre-delivery inspection checklist. Every number is traceable. Every inspector is identified. This is not just paperwork — it is our promise that what we delivered is what we specified.

If you ever have a quality concern, you can contact the lab directly — the contact details are printed on your certificate of conformance. We take every query seriously and commit to a formal investigation within 48 hours.

What happens if a board fails inspection?

A failed board never quietly disappears. The lab follows a fixed non-conformance workflow so the problem is contained, corrected and prevented from recurring:

  • Isolation — the board is tagged, moved off the line and logged in the non-conformance register with the inspector's name and the failed criteria.
  • Rework or scrap — repairable defects (e.g. a valve, a rail weld or a deck-pad corner) are reworked by a certified operator and the repaired area is re-tested to the same standard. Boards that cannot meet specification are scrapped, not downgraded.
  • Re-inspection — every reworked board passes the full affected gate again before it can re-enter the packing line.
  • Release — only boards with all gates signed off leave the plant. The rejection rate, root cause and corrective action are summarised in your batch quality report.

Quality documentation you receive

Every batch ships with a document pack your QC team can audit against: the batch certificate (fabric, adhesive, hardware lot numbers), weld peel-test records, chamber air-test logs per serial number, the signed 100-point pre-delivery checklist, packing list and photographed record of your boards before loading.

Request a sample QC checklist

See the exact inspection gates, test methods and documents your batch would be checked against — send your board type and quantity.